R K Bansal Solutions for Exercise 1: EXERCISE
R K Bansal Mathematics Solutions for Exercise - R K Bansal Solutions for Exercise 1: EXERCISE
Attempt the practice questions from Exercise 1: EXERCISE with hints and solutions to strengthen your understanding. Concise Mathematics I.C.S.E - Class IX solutions are prepared by Experienced Embibe Experts.
Questions from R K Bansal Solutions for Exercise 1: EXERCISE with Hints & Solutions
A swimming pool is long and wide. Its shallow and deep ends are and deep respectively. If the bottom of the pool slopes uniformly, find the amount of water in required to fill the pool.

The cross-section of a tunnel is perpendicular to its length is a trapezium as shown in the following figure. Also, and . The height of the tunnel is . The tunnel is long. Calculate the cost of painting the internal surface of the tunnel(excluding the floor) at the rate of per .

The cross-section of a tunnel is perpendicular to its length is a trapezium as shown in the following figure. Also, and . The height of the tunnel is . The tunnel is long. Calculate the cost of paving the floor at the rate of per .

Water is discharged from a pipe of cross-section area at the speed of . Calculate the volume of water discharged in per .

Water is discharged from a pipe of cross-section area at the speed of . Calculate the volume of water discharged in per .

A hose-pipe of cross-section area delivers of water in . What is the speed of water in through the pipe?

The cross-section of a piece of metal in length is shown above. Calculate the area of the cross-section.

The cross-section of a piece of metal in length is shown below. Calculate the volume of the piece of metal in .
